16 December 2015
BepiColombo MPO PFM successfully finishes Radiated EMC test
Mercury Planetary Orbiter in the Maxwell EMC Facility
 
Last week the Mercury Planetary Orbiter (MPO) flight model has successfully finished its Radiated EMC Test in the Maxwell EMC facility. The test was composed out of EMC launcher compatibility, MPO EMC auto-compatibility and radiofrequency auto-compatibility.

The MPO is ESA's scientific contribution to the BepiColombo mission to Mercury and has been developed and integrated by Airbus Defence & Space and Thales Alenia Space Italy.

In order to perform the Radiated EMC test a dedicated setup has been provided by ETS in cooperation with 'Machinefabriek West-End B.V.' This setup consists of a base frame which support the MPO multipurpose trolley including MPO and the motion / turning system for the RF transparent tower supporting the high gain antenna. With the aid of the motion system it was possible to adjust the MPO high gain antenna exactly in the required test position.

The next BepiColombo test is the Mercury Transfer Module (MTM) Thermal Vacuum and Balance Test in ESTEC's Large Space Simulator.
 

back to news